With a boom in large shopping centre construction, the architects became interested in the possibility of combining huge tiled floor areas with other interesting types of flooring. Our artificial terrazzo system, called "Durabella", is ideal for these purposes. This system allows the architect to design an infinite variety of motives, shapes and colour schemes, which can be inserted between tiled areas or used on the entire surface of the floor.

These floors are made of a wide variety of natural inert materials bonded with a special dyed resin. A nearly infinite number of possible combinations makes each floor an original, almost a work of art, with an audience of thousands passing over it every day.

Surface preparation:
blasting, grinding

Surface priming:
clear epoxy resin primer shaken with fine quartz sand

Surface:
smooth or anti-slip (the anti-slip properties are gained by application of quartz sand shakes followed by grinding, which allows for a fine, medium and coarse floor surface finish, depending on the specific requirements).

Bearing layer:
This is an epoxy plastic concrete layer applied in a thickness of approximately 12 to 15 mm (according to the grain size of the aggregates used). Following the initial curing this layer is milled to a thickness between 8 to 10 mm and subsequently polished so that the surface is made up by the structure of the aggregates used (granite, marble, terrazzo, glass, mother-of-pearl, etc.).

Base layer requirements:
The base layer must be dry, cohesive and clean, e.g. concrete, paving, anhydride, etc.

Humidity:
must not exceed 4%

Air temperature:
15 to 25 °C for application on a surface of similar temperature.

Colour:
according to the RAL chart

Characteristics:
A 2 - 3 mm thick layer stepping layer with high abrasion resistance, long service time and therefore a high utility value.

Application and curing:
surface priming 12 to 24 hours depending on the temperature, bearing layer 12 to 24 hours, walking surface in 24 to 48 hours, full load possible within 7 days.